Objects
SubsetReservation
How a subset item is reserved for an order: complete, or as needed. ‘commissioningPercentage’ is only present for AsNeeded, required there; a value for Complete is refused with 400. (One model with a mode and an optional field, for the same reason as ‘StockTracking’.)
object
SubsetReservationFields
How the subset is reserved.
commissioningPercentage
Int
Share, in percent from 0 to 100, that is picked for an order. Present only for AsNeeded, required there.
Was this page helpful?